Blog 1: Project ATN South Carolina
ATN Engineering has a new project to present: ‘ATN South Carolina’. ATN started this project on 24th of February in 2014. Our client ordered two machines that will be finished in July/August. On the website you can follow the progress of this project.
Project ‘ATN South Carolina’
Our client ordered two different machines for the same plant in South Carolina. The first machine that is under constructions is a degassing machine for refrigerators with three drill-heads and a high pressure condensing unit for maximum performance. The second machine that is under construction is a degassing machine for air conditioning units with high capacity. Both machines have to be installed in July/August in South Carolina in the United States.
Stage one: Frames of the machines
The first stage of making these machines is the construction of the frames. Each machine has a different frame. Below you will find the frames of each machine.